Site-96 Termination Records
The following log details the termination procedures undertaken at Site-96 on 07/18/20XX. The primary objective of the operation was to restrict a subject classified as Keter designation. Initial reports indicate that the termination protocol was successful more info with minimal collateral damage. Subject containment breach occurred at approximately time. Further investigation into the incident's cause is ongoing.
- Key contributors to termination process: Dr.Last Name Redacted, Dr.Last Name Redacted, AgentID number Redacted.
- Primary tools utilized in termination:: M-Class ammunition, dimensional anchor.
Full report pending security clearance level 5 access.
Euclid Containment Breach - Site 96
On 08/15/XXXX| During midday, an anomaly occurred at Site 96, resulting in the breach of Euclid-class entity SCP-XXX. Initial reports indicate improper protocol execution as the primary cause. Security personnel were immediately dispatched to the affected area and engaged in a tactical evacuation.
- The breached entity exhibited significant power fluctuations, posing a potential threat to surrounding infrastructure and personnel.
- Emergency response procedures were implemented with varying degrees of success. Further investigation into the cause of the breach is ongoing, with on-site technicians currently at work.
- Public disclosure| The Foundation has issued a temporary site lockdown order.
Unit Delta-7: : Site 96 Protocol Engaged
An unknown entity has been detected within the confines. All personnel are to remain in place and await further orders.
Subject Delta-7 is to engage {Site Ninety Six Protocol{ immediately. All resources are to be allocated as needed.
- Ensure radio silence unless absolutely necessary.
- Log all occurrences immediately.
- Stay alert at all times. This is a critical situation.
Site-96 Anomaly Analysis Summary
A comprehensive review of the anomalous events at Site-96 has been concluded. The initial findings indicate a complex and evolving system exhibiting traits consistent with non-Euclidean activity. Additional research is required to define the nature and purpose of this anomaly.
- Notable insights:
- Persistent energy fluctuations
- Displaced coordinates
- Undecipherable signals
Proposed actions include increased monitoring of the site and implementation of a dedicated research team. Containment procedures should be updated to reflect the evolving nature of this anomaly.
Perimeter Security Protocol: Site 96 Activation
A complete lockdown has been instated within Secure Zone Alpha-2, specifically at Site 96. All personnel are to stay to designated safe areas and cease all non-essential activities. External access to the site has been strictly prohibited. Any unauthorized individuals attempting to breach the perimeter will be handled according to protocol.
Intelligence gathered points towards a potential threat. The situation is being actively monitored by security forces, and updates will be communicated as they become available.
Remain calm, follow all instructions from authorized personnel, and cooperate fully with the ongoing investigation.
Examination into Anomalous Signal Originating from Site-96
Preliminary evaluation of the anomalous signal detected at Site-96 indicates a probable source originating from deep within the facility. The signal, characterized by irregular modulations in electromagnetic band, has exhibited significant intensity peaks at specific frequencies. Attempts are currently underway to identify the exact origin of the signal and determine its type. A team of specialist researchers, including cryptographers, physicists, and specialist scientists, have been deployed to Site-96 to conduct a thorough examination.
- Initial findings suggest the signal may be artificial, though more analysis is required for confirmation.
- Security protocols at Site-96 have been reinforced in light of the anomalous event.
- Access to the site is currently denied to authorized personnel only.